Welcome to Dale's Blog

Terraced Housing – Coogee: Stage 1 (Driftwood)

Posted in Projects Completed

The collaboration between Dale Alcock Projects, Webb Brown-Neaves and Yolk Property Group saw the successful delivery of 21 two and three level terrace, premium quality townhouses in Port Coogee.

Terraced Housing – Coogee: Stage 2 (Driftwood)

Posted in Projects Completed

The second stage of a project in collaboration with Webb and Brown Neaves and Yolk Property Group. This is the second stage of Driftwood which includes 7 new terraced houses.

NDIS – Specialist Disability Accommodation (Rocky Bay)

Posted in Projects Completed

Rocky Bay’s first Specialist Disability Accommodation (SDA) project, a duplex project to cater for 6 residents was completed within a 5 month construction program.

Childcare Centre – Albany Hwy, Kelmscott

Posted in Projects Completed

The delivery of a 110-place childcare centre engaged by Mandalay Capital under a Design and Construct contract. The centre was built from a lightweight timber framed system.

Apartments – Fulham Street, Cloverdale

Posted in Projects Completed

Dale Alcock Projects delivered 16 apartments over three levels for a private client in Jan 2020